Appalachian Sheds Inc. · Options & Upgrades Center

Build the Building Around the Way You Plan to Use It.

The best building is not the one with the most upgrades. It is the one where the site, structure, roof, openings, comfort systems, utilities, and finishes were selected in the right order for the way the building will actually serve you.

This Center is the simple front door to Appalachian Sheds' complete Options & Upgrades program. Start with your intended use, review the decisions that are hardest to change later, and then open only the option categories that apply to your project.

Detailed specifications and planning ranges remain on the individual option pages so the same pricing is not repeated across multiple parts of the website.

Site First Placement, drainage, pad, support, access, and utilities.
Structure Second Floor system, framing, wall depth, openings, and roof geometry.
Performance Third Roofing, insulation, ventilation, electrical, HVAC, and moisture control.
Finish Last Exterior finish, interior finish, storage, and architectural details.
When Should I Decide?

Upgrade Mistakes Are Usually Timing Mistakes.

The most expensive change is often a good option chosen after the best installation point has already passed. Use this sequence to keep planning logical.

01 Before Site Work

Placement, drainage, pad, foundation, buried utilities, and access.

02 Before Framing

Floor system, wall depth, doors, windows, lofts, porches, and structural roof features.

03 Before Roofing

Roof material, skylights, dormers, cupolas, ventilation, and roof projections.

04 Before Wall Closure

Electrical, HVAC, plumbing readiness, insulation, and moisture-control systems.

05 Before Interior Finish

Wall and ceiling finishes, trim, storage, lighting locations, and finished flooring.

06 Often Addable Later

Selected shelving, accessories, decorative details, and some surface finishes.

Planning Group 01

Site, Base & Floor

These are the earliest decisions because they determine how the building bears on the property, how water is managed, and how the floor performs over time.

Site Readiness

Site Preparation & Building Pad

Clearing, grade, drainage, stone preparation, geotextile, and the ASI moisture-control pad system.

Best decided: Before final pricing and scheduling.
Explore Site Preparation
Support System

Foundation & Base Options

Support, leveling, separation from ground conditions, and compatibility with the selected building.

Best decided: Before floor framing and final layout.
Explore Foundation Options
Structural Floor

Flooring & Structural Floor Options

Subfloor systems, pressure-treated upgrades, heavy-use floors, and finished-floor readiness.

Best decided: Before floor framing.
Explore Floor Options
Underfloor Comfort

Floor Insulation

Protected batt systems, mineral wool, closed-cell spray foam, and premium insulated-floor packages.

Best decided: Before the floor assembly is closed.
Explore Floor Insulation
Planning Group 02

Structure, Exterior & Roof

These choices define the building shell, weather protection, architectural character, maintenance expectations, and long-term durability.

Structural Standards

Construction Materials & Structural Standards

Framing, pressure-treated lumber, plywood and OSB distinctions, siding backing, fasteners, and connector standards.

Best decided: During base-building specification.
Explore Material Standards
Exterior Envelope

Siding Options

Current ASI siding systems, backing requirements, WRB coordination, and exterior appearance.

Best decided: Before exterior close-in.
Explore Siding Options
Exterior Finish

Paint, Stain & Exterior Finish Systems

Paint systems, natural-wood finishes, stains, trim accents, and substrate-compatible finish planning.

Best decided: After siding and trim direction are known.
Explore Exterior Finishes
Roof System

Roofing & Roofline Upgrades

Roofing materials, underlayment, flashing, soffit, fascia, and primary roof-system upgrades.

Best decided: Before roofing begins.
Explore Roofing Options
Roof Comparison

Metal Roofing vs. Architectural Shingles

A focused comparison of cost, sound, maintenance, appearance, service life, and ownership priorities.

Best decided: Before final roof selection.
Compare Roof Systems
Moisture & Airflow

Ventilation & Moisture Control

Vented versus unvented roof assemblies, dehumidification, ERVs, vapor planning, and humidity monitoring.

Best decided: Before roof and wall assemblies are closed.
Explore Moisture Control
Planning Group 03

Openings, Daylight & Access

These decisions affect daily movement, natural light, equipment access, security, views, ventilation, and the framing of the building itself.

Entry Systems

Doors & Entry Systems

Fiberglass and specialty doors, double-door systems, glazing, hardware, weather protection, and equipment access.

Best decided: Before wall framing.
Explore Door Options
Wall Daylight

Windows & Natural Light

Window type, size, placement, ventilation, privacy, daylight, and finished-room layout.

Best decided: Before wall framing.
Explore Window Options
Overhead Daylight

Skylights & Overhead Daylight

Fixed, venting, powered, tubular, and curb-mounted skylight systems with flashing and light-shaft planning.

Best decided: Before roof framing and roofing.
Explore Skylight Options
Building Access

Ramps, Steps, Landings & Access

Equipment ramps, steps, landings, threshold transitions, and practical access planning.

Best decided: With site grade and door elevation.
Explore Access Options
Planning Group 04

Function, Storage & Architectural Character

These options improve usefulness, storage capacity, exterior presence, and property fit after the primary structure and openings are understood.

Vertical Space

Lofts, Ladders & Stairs

Storage lofts, access ladders, and stair systems coordinated with framing, headroom, and lighting.

Best decided: Before roof and interior framing.
Explore Loft Options
Organization

Shelving, Workbenches & Storage

Built-ins, work surfaces, wall organization, and storage layouts coordinated with doors, windows, and utilities.

Best decided: After the primary layout is clear.
Explore Storage Options
Architectural Entry

Porches, Awnings, Dormers & Architectural Roofline

Porches, entry canopies, dormers, gable overhangs, and integrated architectural roofline features.

Best decided: Before structural framing and roofing.
Explore Architectural Options
Exterior Detail

Fascia & Trim Packages

Rake, fascia, soffit, trim depth, and detail combinations that complete the roofline and exterior.

Best decided: With siding and roofing.
Explore Trim Packages
Exterior Character

Decorative Exterior Accents

Shutters, flower boxes, brackets, gable accents, and restrained visual details.

Best decided: After siding, windows, and trim.
Explore Exterior Accents
Roofline Accent

Cupolas & Weathervanes

Architectural roofline accents and, where designed appropriately, possible passive ventilation support.

Best decided: Before roofing.
Explore Cupola Options
Planning Group 05

Comfort, Interior & Utilities

These categories turn a basic building into a workshop, office, studio, pool house, retreat, or premium finished flex space.

Power & Climate

Electrical, Lighting, HVAC & Comfort Systems

Electrical service, outlets, lighting, mini-splits, technology pathways, and comfort-system readiness.

Best decided: Before insulation and interior finish.
Explore Electrical & HVAC
Thermal Envelope

Interior Insulation, Wall & Ceiling Systems

Thermal performance, sound control, wall and ceiling systems, and finish readiness.

Best decided: Before wall and ceiling closure.
Explore Insulation Options
Finished Space

Interior Finish Packages

Utility interiors, office and studio packages, drywall, plywood, T&G, shiplap, beadboard, and trim.

Best decided: After utilities, moisture, and insulation are resolved.
Explore Interior Finishes
Water & Utilities

Plumbing, Water & Utility Readiness

Water supply, drains, utility routes, frost protection, rough-in sequencing, and licensed-trade coordination.

Best decided: Before floor and wall close-in.
Explore Plumbing Readiness
Pricing Transparency

One Price Should Have One Authoritative Home.

The Options Center intentionally does not repeat detailed pricing from every category. Each individual option page owns its current planning ranges, scope notes, and price drivers.

This prevents the same option from showing one price on the Center, another price on a category page, and a third price inside a calculator.

Use This Center to Decide Where to Look. Use the individual category page to compare specifications, planning ranges, timing, and upgrade scope.
Next Step

Design the Building Before Construction Begins.

Appalachian Sheds can help separate the decisions that must be made early from the options that can safely wait. That protects the budget, reduces change work, and keeps the building coordinated from the pad through the final finish.

The goal is not to sell every upgrade. The goal is to build the right structure for your property, intended use, and long-term plans.

Planning Approach Site · Structure · Exterior · Access · Comfort · Utilities · Finish
Appalachian Sheds Inc. Veteran & Family-Owned · 35+ Years of Experience · 30-Year Structural Warranty
Request a Property Walk-Through Ask About Options