Appalachian Sheds Inc. · Options & Upgrades Center

Build the Building Around the Way You Plan to Use It.

The best building is not the one with the most upgrades. It is the one where the site, structure, roof, openings, comfort systems, utilities, and finishes were selected in the right order for the way the building will actually serve you.

This Center is the simple front door to Appalachian Sheds' complete Options & Upgrades program. Start with your intended use, review the decisions that are hardest to change later, and then open only the option categories that apply to your project.

Detailed specifications and planning ranges remain on the individual option pages so the same pricing is not repeated across multiple parts of the website.

Site First Placement, drainage, pad, support, access, and utilities.
Structure Second Floor system, framing, wall depth, openings, and roof geometry.
Performance Third Roofing, insulation, ventilation, electrical, HVAC, and moisture control.
Finish Last Exterior finish, interior finish, storage, and architectural details.
When Should I Decide?

Upgrade Mistakes Are Usually Timing Mistakes.

The most expensive change is often a good option chosen after the best installation point has already passed. Use this sequence to keep planning logical.

01 Before Site Work

Placement, drainage, pad, foundation, buried utilities, and access.

02 Before Framing

Floor system, wall depth, doors, windows, lofts, porches, and structural roof features.

03 Before Roofing

Roof material, skylights, dormers, cupolas, ventilation, and roof projections.

04 Before Wall Closure

Electrical, HVAC, plumbing readiness, insulation, and moisture-control systems.

05 Before Interior Finish

Wall and ceiling finishes, trim, storage, lighting locations, and finished flooring.

06 Often Addable Later

Selected shelving, accessories, decorative details, and some surface finishes.

Planning Group 01

Planning, Site & Floor

Start here for the project-wide pricing guide, site and foundation decisions, floor and subfloor selections, complete structural floor-system planning, and underfloor comfort systems. These are among the earliest selections because they affect elevation, support, load capacity, moisture strategy, access, and finished-floor expectations.

Pricing Planning

Options & Upgrades Pricing Overview

Customer-facing planning ranges for major upgrade categories, with cost drivers and early-budget guidance before final design.

Best used: Early in planning and again before final scope review.
Review Pricing Overview
Site & Support

Site & Foundation Options

Placement, access, drainage, building-pad preparation, support systems, final elevation, and site conditions that affect the completed structure.

Best decided: Before final pricing, scheduling, and floor framing.
Explore Site & Foundation Options
Structural Floor

Flooring & Subfloor Options

Structural subfloor choices, pressure-treated floor upgrades, heavy-use floor systems, finished-floor readiness, and durability planning.

Best decided: Before the floor assembly is framed and closed.
Explore Floor Options
Structural Floor System

Flooring & Structural Floor Systems

Joist size and spacing, clear span, beam support, structural deck and subfloor ratings, heavy-load planning, moisture exposure, and finish-floor readiness.

Best decided: Before floor framing, heavy-load placement, insulation, and finished-floor selections are finalized.
Explore Structural Floor Systems
Underfloor Comfort

Floor Insulation & Underfloor Comfort Systems

Protected batt systems, mineral wool, closed-cell spray foam, and insulated-floor planning for workshops, offices, studios, and other conditioned spaces.

Best decided: Before the floor assembly becomes difficult to access.
Explore Floor Insulation
Planning Group 02

Structure, Exterior & Roof

These selections establish the building shell, weather protection, exterior appearance, roof performance, architectural character, and long-term maintenance expectations.

Structural Standards

Construction Materials & Structural Standards

Framing, pressure-treated lumber, structural sheathing, siding backing, fasteners, connectors, and the material standards behind the finished building.

Best decided: During base-building specification.
Explore Structural Standards
Exterior Envelope

Siding & Exterior Finishes

ASI's revised siding systems, required backing and preparation, weather-resistive coordination, trim interfaces, and exterior appearance.

Best decided: Before exterior close-in.
Explore Siding Options
Exterior Finish

Paint, Stain & Exterior Finish Systems

Paint systems, stains, natural-wood finishes, trim accents, color coordination, and substrate-compatible exterior finish planning.

Best decided: After siding and trim direction are established.
Explore Exterior Finishes
Roof System

Roofing & Roofline Upgrades

Roofing materials, underlayment, flashing, ventilation interfaces, overhangs, protection details, and primary roofline upgrades.

Best decided: Before roof framing and roofing begin.
Explore Roofing Upgrades
Roof Comparison

Metal Roofing vs Architectural Shingles

A focused comparison of appearance, sound, maintenance, installation considerations, service life, and planning priorities.

Best decided: Before the final roof system is selected.
Compare Roof Systems
Moisture & Airflow

Ventilation & Moisture Control

Passive and mechanical ventilation, roof-assembly strategy, humidity management, vapor planning, and moisture-control coordination.

Best decided: Before roof and wall assemblies are closed.
Explore Moisture Control
Exterior Detail

Fascia & Trim Options

Fascia, rake, soffit, corner, window, door, and related trim details that complete the exterior and define the finished edge conditions.

Best decided: With siding, roofing, doors, and windows.
Explore Fascia & Trim
Exterior Character

Decorative Exterior Accents

Shutters, flower boxes, brackets, gable details, and restrained architectural accents that add character without changing the core building system.

Best decided: After siding, openings, and trim are established.
Explore Exterior Accents
Roofline Accent

Cupolas & Weathervanes

Cupola sizes, mounting considerations, weathervane selections, and roofline coordination for decorative or appropriately designed ventilating applications.

Best decided: Before roofing is completed.
Explore Cupolas & Weathervanes
Architectural Features

Porches, Awnings, Dormers & Architectural Roofline Options

Porches, entry canopies, awnings, dormers, gable overhangs, and integrated roofline features coordinated with structure and weather protection.

Best decided: Before structural framing and roofing.
Explore Architectural Options
Pricing Transparency

One Price Should Have One Authoritative Home.

The Options Center intentionally does not repeat detailed pricing from every category. Each individual option page owns its current planning ranges, scope notes, and price drivers.

This prevents the same option from showing one price on the Center, another price on a category page, and a third price inside a calculator.

Use the Pricing Overview for Early Budget Planning. Then use each individual category page for specifications, scope, timing, and the current planning ranges that apply to that option. Open Options & Upgrades Pricing Overview →
Next Step

Design the Building Before Construction Begins.

Appalachian Sheds can help separate the decisions that must be made early from the options that can safely wait. That protects the budget, reduces change work, and keeps the building coordinated from the pad through the final finish.

The goal is not to sell every upgrade. The goal is to build the right structure for your property, intended use, and long-term plans.

Planning Approach Site · Structure · Exterior · Access · Comfort · Utilities · Finish
Appalachian Sheds Inc. Veteran & Family-Owned · 35+ Years of Experience · 30-Year Structural Warranty
Request a Property Walk-Through Ask About Options